Prior to Installation
TRANSPORT, STORAGE AND ACCLIMATISATION
Transport and store the cartons in laying position.
Packaged tiles and adhesive should be acclimatized at job site in dry,
well-ventilated area for a minimum of 48 hours so that flooring may
acclimate.
Remove tiles from packages just before starting laying.
During storage and installation, maintain temperature and relative
humidity to a level consistent with the conditions which will prevail
when the building is occupied. In most cases, this means maintaining
temperature range of 18ºC to 28ºC (65 F to 82F) and relative humidity
range of 35% to 65%. In order to reach this climate, use heating or air
conditioning in the appropriate length of time prior to beginning
installation.
WICANDERS floorings are natural products and some shade variation is an
inherent and attractive characteristic. To achieve the most pleasant
blend of shades, shuffle before laying.
SITE INSPECTION
Prior to installation, please inspect the tiles in daylight for any
visible faults or damage, and also check if the subfloor and site
conditions are in accordance with the specifications described within
these instructions.